Contract admin settings

Organization-wide settings for RFIs, submittals and change orders: filing from project email, AI drafts for Procore records, the Cogram Automatic Review prompts, submittal response statuses, and what

Org Admins manage organization-wide settings for RFIs, submittals and change orders under Organization Settings > Contract admin. The tab has five sections: Filing, AI drafts, Automatic review, Submittal responses and Cover sheets.

Availability: The Contract admin tab appears for Org Admins when your organization has Contract admin. You do not need a Contract admin license yourself to change these settings. See Licensing.

Filing

Cogram can file RFIs, submittals and change orders from project email. The Filing section has one switch for each, and each switch applies to the whole organization:

  • RFI filing files a qualifying email as an RFI and drafts a response for review.

  • Submittal filing files a qualifying email as a submittal and drafts a review.

  • Change order filing files a qualifying email as a change order and fills in its details for review.

Turn a switch off to pause that filing on every project. Projects keep their own settings, so turning the switch back on restores them.

A record is filed for a project only when all of these are true:

  1. The switch is on here.

  2. Email filing is on for the project.

  3. The matching switch is on for the project, under Overview > Automations.

Cogram turns the three project switches on when someone turns on Email filing for a project. See RFI, submittal and change order filing.

Expected result: on a project's Automations tab, a row you paused here is locked and reads "Paused for your organization."

A switch reads "Not set up yet"

Cogram sets up the three filing Automations when someone in your organization gets an Agent license. Assign an Agent license to one person under Organization Settings > Licenses, then reload this page. Contact Cogram support only if your organization does not have Agent.

AI drafts

Draft responses for Procore records controls the drafts Cogram starts by itself in connected Procore projects. It is off until an Org Admin turns it on.

When it is on, Cogram drafts a response each time an RFI or submittal in a connected Procore project lands in your court. It applies only to Procore projects where RFI filing or Submittal filing is on. Items already in your court when you turn it on are skipped.

Pausing RFI filing or Submittal filing for the organization in the Filing section also stops these drafts for that record type, on every project.

The switch does not change two other drafts. The Draft response action on a record always works, and a record filed from an email always gets its draft.

Review every draft before you send it. Check names, dates, quantities, and specification and contract references against the source.

Automatic review

The Cogram Automatic Review is the review card at the end of an RFI, submittal or change order page. Click Run review on the card, or Rerun in its menu, and Cogram writes one review of the record: what needs action first, each finding with a link to the file page or record it comes from, and a suggested next step. The card shows a verdict: Looks good, Comments or Action needed.

When the review finds that a consultant from the project directory should review the record next, it offers to send it to them: the firm's name in the review becomes a link, and Suggested actions under the review has a Send to button for each. Clicking opens Send for review with that person and a short note filled in. You can change anything before you send. A consultant who is already reviewing the record shows Already reviewing instead.

The Automatic review section holds the reviewing instructions Cogram follows, one prompt per record type: RFI, Submittal and Change order.

Change a prompt (Org Admins)

  1. Open the Automatic review section of Organization Settings > Contract admin.

  2. Edit the prompt of a record type. For example, add what your firm checks first on every submittal.

  3. Click Save.

The line above each prompt says Cogram default, or who changed it last and when. Reset to default returns that record type to Cogram's prompt. A record type you have not changed follows Cogram's default, including later improvements to it.

The prompt holds the reviewing instructions only. The record's details, the output format, the verdicts, the links and the safety rules are fixed by Cogram.

Expected result: rerun the review on a record of that type. The new review follows your prompt. Reviews that ran before keep their text until they are rerun.

Submittal responses

Set the response statuses your team picks from when responding to a submittal, such as Approved or Revise and Resubmit. Org Admins do this under the Submittal responses section of Organization Settings > Contract admin.

Where the statuses apply

  • Submittals that are not linked to Procore: those created from an email, and those recorded in Cogram only.

  • The label you set is the one your team picks, the one shown on the submittal (thread, board, list, and cover sheet), and the one printed in the email to the contractor.

Where they do not apply

  • Procore-linked submittals. They keep the standard statuses, which Cogram maps to the response types of the Procore project.

  • RFIs. An RFI response is an answer and has no status.

Change the statuses (Org Admins)

  1. Open the Submittal responses section of Organization Settings > Contract admin.

  2. Edit a label. A label can have up to 60 characters.

  3. Drag a status by its handle to change the order.

  4. Turn a status off to stop offering it. At least one status stays on. Not Applicable is off until you turn it on.

  5. Click Save changes.

There are six statuses. You can rename, reorder, and turn them off, but you cannot add new ones.

Expected result

Open a submittal that is not linked to Procore in Contract Admin > Submittals and respond. The statuses offered are the ones you left on, under your labels, in your order.

Renaming a status also renames it on submittals already responded to in Cogram. Emails already sent do not change.

Start over

Reset to defaults puts the labels, the order, and the switches back to how Cogram ships them. You are asked to confirm first.

Cover sheets

Cogram puts a cover sheet in front of every RFI, submittal, change order and transmittal your firm downloads or sends. The Cover sheets section of Organization Settings > Contract admin sets what your firm prints on it.

Every field is optional. An empty field prints nothing: no heading, no blank line.

Limitation wording

Two texts, each in your firm's own words:

  • The RFI text prints under the official response on an RFI your firm has answered. An RFI with no response prints none.

  • The submittal text prints in the review stamp on a submittal your firm has returned. A submittal still under review prints none.

Use suggested wording fills the editor with a starting point. It is a draft, not a default: read it, edit it to match your agreements, and save. Cogram prints nothing until you do. Each text can have up to 1,000 characters.

Letterhead

Your firm's address, phone and website print under your firm name or logo in the sheet header, small and secondary.

These three fields are your firm identity, the same one under Organization Settings > General. Change the address here and it changes there too, so your firm has one address of record.

Your firm's role on a job ("Architect of record", "Design architect") is set per project, not here. See Firm role below.

Preview

Sample RFI cover and Sample submittal cover download a sheet that carries your saved settings on obviously-sample content, so you read your own wording on a sheet before a consultant does. Save first: the sample shows what is saved, not what is in the editor.

Firm role

Set your firm's role for one project on that project's Overview > Settings tab, in the Firm role section. It prints with your firm identity on that project's cover sheets. Project owners and Org Admins can change it. Left blank, nothing prints.

One firm is the architect of record on one job and the design architect on the next, which is why the role is per project and the letterhead is not.